Project management
Pay applications and billing
A pay application that misses the cutoff waits another month. Varni builds the schedule of values, prepares AIA-style G702/G703 billing every period with backup and lien waivers attached, and follows up until payment arrives, whether you are billing the owner or reviewing your subcontractors' applications.
What's included
Billing that gets approved the first time.
Schedule of values
Built from your estimate, balanced to the contract sum, front-loading avoided so it is approved without a fight.
Continuation sheet
Previous work, this period, stored materials, percent complete, balance to finish and retainage on every line.
Application summary
Contract sum, change orders, retainage, previous payments and current amount due, reconciled every period.
Approved change orders
Signed changes added as their own lines so they are visible and paid.
Lien waivers and backup
Waivers, stored-material invoices and insurance certificates attached as required.
Payment follow-up
Submission confirmed, rejections fixed fast, and polite follow-up until the check or transfer clears.
The monthly cycle
Every billing period, the same four steps.
- 01
Measure
Percent complete confirmed with your foreman, with photos where the GC asks for them.
- 02
Prepare
G702/G703 billing, change orders and stored materials updated and reconciled.
- 03
Submit
Sent before the GC's cutoff with waivers and backup, through their portal or email.
- 04
Collect
Approval tracked, questions answered, payment followed until received.
Both directions
Subcontractor and owner pay applications.
Owner pay applications
Your application to the owner or GC: schedule of values, approved change orders, stored materials, retainage and the waivers and backup the contract requires.
Subcontractor pay applications
Your subcontractors' applications collected, checked against progress, change orders and retainage terms, and rolled into your own billing with their waivers.
Pay application guides
Everything about getting paid.
How to prepare a pay application
Ten steps from progress to payment.
GuideG702 vs G703 explained
The summary page and continuation sheet.
GuideWhy pay applications get rejected
Common reasons and the fix for each.
GuideBilling stored materials
On-site, off-site and the backup required.
GuideRetainage explained
How it is held and how to get it released.
Free toolPay application calculator
G703 lines, retainage and amount due.
We do this all day
Not sure what you need? Email us.
Describe the project and where you need help. You'll get a reply from our PMP® and LEED AP BD+C credentialed staff and a project-specific proposal in 48–72 hours. No set prices: you pay for what your project needs.
Opens your email app with a short draft. Add a line and attach PDFs.
Questions we hear
Do you use official AIA forms?
If your contract requires the official AIA G702/G703 documents, they must be licensed from AIA; we prepare your billing on the licensed forms you or the GC provide. Otherwise we prepare AIA-style billing on our own G702/G703-format templates, or on the GC's own forms or portal.
What is a schedule of values?
A breakdown of your contract sum into line items, used to bill progress each month. A good one is detailed enough to bill accurately and simple enough to approve quickly. See our schedule of values guide.
How is retainage handled?
Retainage is withheld at the rate in your contract, often 5% to 10%, and sometimes reduced later in the job. We track retainage held on every pay application and request its release at closeout.
Do you handle lien waivers?
We prepare and collect the conditional and unconditional waivers your contract and state require, using the forms they specify, and track which payment each one covers.
Work with Varni
Bring Varni onto your next project.
Send the drawings, the deadline and where you need help. We reply with a clear scope, a project-specific fee and a start date.
or write to ravid@varni-ventures.com No set prices · Proposal in 48–72 hours