How to build a schedule of values

The schedule of values is the backbone of every pay application for the life of the job. Get it right once and billing becomes routine; get it wrong and every month is a negotiation.

Varni · Updated · 6 min read

What a good schedule of values does

  • Adds up exactly to your contract sum.
  • Is detailed enough that progress on each line can be checked in the field.
  • Is simple enough that the GC can approve it quickly.
  • Matches how your estimate was built, so budget, billing and cost reports line up.

How to structure the lines

ApproachExample linesWorks well for
By area or floorLevel 1, Level 2, RoofMulti-story buildings with repeated scope
By systemDomestic water, sanitary, storm, fixturesMEP trades
By phaseUnderground, rough-in, trim, start-upWork that follows clear stages
CombinedLevel 2 rough-in, Level 2 trimLarger jobs where the GC wants detail

Lines not to forget

  • Mobilization, at a realistic value.
  • Submittals and shop drawings, if your contract allows billing for them.
  • Material and labor splits for major items.
  • Testing, start-up and commissioning support.
  • Closeout documents and as-builts, so closeout work is visibly part of the contract.
  • General conditions, if your contract treats them separately.

Build it from the estimate

Your estimate already breaks the job into quantities, labor and material. Roll it up into the line structure the GC wants, spread overhead and profit across lines in proportion, and check that the total matches the contract sum to the cent.

Keep it alive

Add approved change orders as new lines as soon as they are signed. Do not rebalance base lines mid-job without the GC's agreement. Each month, the schedule of values feeds the G703 continuation sheet; try it in our pay application calculator.

We do this all day

Stuck on this? Email us.

Send us what you have and where you're stuck. Our PMP® and LEED AP BD+C credentialed staff will reply with next steps, and if you'd rather hand it off, a project-specific proposal in 48–72 hours.

Email Varni

Opens your email app with a short draft. Add a line and attach PDFs.

Questions we hear

Can I front-load the schedule of values?

Weighting early lines to collect cash sooner is common, and GCs watch for it. Heavy front-loading gets rejected and damages trust. Price lines at their real value; use a reasonable mobilization line instead.

Should labor and material be separate lines?

Often yes. Separate lines let you bill materials when installed or stored and labor as it is performed, and they make the GC's review easier. Some GCs require the split.

How do change orders appear on the schedule of values?

Approved change orders are added as new lines, usually at the bottom with their change order number, and billed like any other line.

Work with Varni

Bring Varni onto your next project.

Send the drawings, the deadline and where you need help. We reply with a clear scope, a project-specific fee and a start date.

or write to ravid@varni-ventures.com No set prices · Proposal in 48–72 hours