Preconstruction
Construction estimating and quantity takeoff
Accurate quantities, honest pricing and every assumption written down. Varni builds the estimate from the drawings and specifications on your rates and your quotes; you make the final call on price.
What's in a Varni estimate
From bid documents to a number you trust.
Each estimate is built to be checked: quantities you can trace back to the drawings, prices you can trace back to a rate or a quote.
Quantity takeoff
Quantities measured from the drawings and specifications, organized by area, floor, system or phase, with marked-up sheets.
Labor pricing
Hours built from your productivity and crew rates, so the labor line reflects how your people actually work.
Material and equipment
Material, equipment and rentals priced from your supplier quotes or price lists.
Quote leveling
Supplier and lower-tier quotes compared scope for scope, with gaps and exclusions called out before bid day.
Inclusions, exclusions, assumptions
What is in, what is out and what you assumed, written down so the proposal and the job match the number.
Bid-day support
Addenda checked, late quotes plugged in, the bid form filled and the proposal ready to send.
How an estimate comes together
Four steps, one clear number.
- 01
Documents in
You send drawings, specs, addenda, the bid form and the due date. We confirm scope and a delivery date.
- 02
Takeoff
Quantities measured and organized the way you price, with every counted item marked on the sheets.
- 03
Pricing
Labor, material, equipment and quotes priced on your numbers, with risks and assumptions listed.
- 04
Review & submit
We walk you through the estimate. You set the final price; we turn it into the proposal.
Quantity takeoff, on its own or as part of the estimate
Plenty of contractors price their own work and only need the counting done. A Varni takeoff gives you quantities you can drop straight into your pricing:
- Organized the way you price: by area, floor, system, phase or bid item.
- Traceable: marked-up drawings show exactly what was counted and where.
- Spec-aware: items the specifications require but the drawings understate are flagged.
- Addenda tracked: changes from each addendum noted against the original count.
From estimate to proposal to schedule of values
The estimate is the start of the job's paper trail, not a one-off. The same structure becomes your proposal, and when you win, your schedule of values and budget, so nothing is rebuilt from scratch and your billing matches what you bid.
Bid opportunities and prequalification
More good estimates only help if they reach the right bid lists. Varni sorts the invitations you receive, logs every lead with its due date and documents, and keeps your prequalification package current so you are ready when an invitation arrives.
Ways to use Varni for estimating
Pick the level of help you need.
From a single takeoff to every bid you send out. No set prices: send the bid documents and you'll have a proposal in 48–72 hours.
Quantity takeoff
Quantities and marked-up drawings; you price it.
Priced estimate
Takeoff, labor, material and quotes on your numbers, bid-ready.
Second set of eyes
An independent review of your estimate before bid day, or of a contractor's estimate for owners. Owner's rep.
Your estimating department
Every bid you choose to pursue, logged with due dates and documents.
We do this all day
Not sure what you need? Email us.
Describe the project and where you need help. You'll get a reply from our PMP® and LEED AP BD+C credentialed staff and a project-specific proposal in 48–72 hours. No set prices: you pay for what your project needs.
Opens your email app with a short draft. Add a line and attach PDFs.
Questions we hear
Do you set our prices?
No. The estimate is built on your labor rates, productivity, supplier quotes and markup. You review it and decide the final number. We point out risks and assumptions so that decision is informed.
What do you need from us to start?
The bid documents (drawings, specifications, addenda and the bid form), the due date, and your labor rates and markup if you want a priced estimate. For a takeoff only, the drawings and specifications are enough.
Can you do a quantity takeoff only?
Yes. Many clients send drawings for a takeoff and price it themselves. You get quantities organized the way you price: by area, floor, system or phase, with marked-up drawings showing what was counted.
What estimating software do you use?
We work in your existing estimating tools and templates where we can, or in spreadsheets built for your scope. Tell us what you use on the discovery call.
How fast is turnaround?
It depends on the size of the bid set and the scope. We confirm a delivery date before we start and plan it around your bid due date, leaving you time to review.
Can you help us get on more bid lists?
Yes. We prepare and keep current the prequalification packages general contractors ask for, using the company, insurance and safety documents you provide, and we log bid invitations and due dates so nothing is missed.
Work with Varni
Bring Varni onto your next project.
Send the drawings, the deadline and where you need help. We reply with a clear scope, a project-specific fee and a start date.
or write to ravid@varni-ventures.com No set prices · Proposal in 48–72 hours