What a review typically catches
| Issue | Example |
|---|---|
| Missing scope | A spec section with no line in the estimate |
| Quantity errors | Wrong scale, outdated sheet or a missed floor |
| Double counts | Overlapping areas counted twice |
| Unrealistic labor | Productivity that doesn't match the conditions |
| Allowances | Carried at the wrong amount, or missing |
| Exclusions | Items excluded in quotes but not in the proposal |
| Addenda | Changes not reflected in quantities |
For contractors: before bid day
A reviewer checks the largest line items, compares totals against a cost-per-unit sanity check, and reads the specs for anything without a line. Done a day before the bid, it leaves time to fix what's found.
For owners: before you sign
An owner's review compares the contractor's estimate or bids against the drawings: what's included, what's excluded, which allowances will become change orders, and whether the numbers are reasonable. See owner's representative and estimate review.
How to get the most from a review
- Send the estimate with the documents it was built from.
- Ask for findings in writing, ranked by dollar impact.
- Leave time to act on them.
We do this all day
Stuck on this? Email us.
Send us what you have and where you're stuck. Our PMP® and LEED AP BD+C credentialed staff will reply with next steps, and if you'd rather hand it off, a project-specific proposal in 48–72 hours.
Opens your email app with a short draft. Add a line and attach PDFs.
Questions we hear
Does the reviewer change our price?
No. The reviewer reports findings; you decide what to change.
Can a review be done remotely?
Yes. It's done from the drawings, specs, estimate and quotes.
How long does a review take?
It depends on the size of the estimate. Send it with your deadline and you'll get a proposal in 48–72 hours.