Bid day estimate checklist: 20 checks before you submit

Bid day compresses a week of decisions into a few hours. A short checklist keeps late quotes, addenda and a tired estimator from turning a good estimate into a bad bid.

Varni · Updated · 6 min read

Documents

  1. Every addendum acknowledged on the bid form and reflected in the takeoff.
  2. The bid form matches the latest version, including alternates and unit prices.
  3. Bid due time, delivery method and time zone confirmed.
  4. Required attachments listed: bid bond, forms, certifications, schedule of values.

Scope

  1. Every specification section in your scope has a line in the estimate.
  2. Items "by others" confirmed against the drawings and spec, not assumed.
  3. Allowances carried at exactly the amounts the documents state.
  4. Exclusions and clarifications written down for the proposal.

Quotes

  1. Supplier and subcontractor quotes leveled scope for scope.
  2. Quote exclusions checked against what you are including.
  3. Freight, taxes, escalation and quote validity accounted for.
  4. Plugs for missing quotes marked clearly so you can update them at the last minute.

Labor and markup

  1. Labor hours sanity-checked against similar past jobs.
  2. Wage rates current, including any prevailing wage requirements.
  3. General conditions priced for the actual schedule duration.
  4. Overhead, profit, bond and insurance applied the way you intend.

Final review

  1. Big-number check: cost per square foot or unit compared with similar work.
  2. The five largest line items reviewed by a second person.
  3. The proposal letter matches the estimate's scope, exclusions and alternates.
  4. A copy of everything submitted saved with the bid log.
Time before deadlineFocus
Day beforeAddenda, scope review, plugs identified
MorningQuotes in and leveled, labor reviewed
Two hoursMarkup, big-number check, proposal drafted
Final hourLate quotes plugged, bid form completed, submitted

Varni supports bid days with estimating, quote leveling and proposal writing.

We do this all day

Stuck on this? Email us.

Send us what you have and where you're stuck. Our PMP® and LEED AP BD+C credentialed staff will reply with next steps, and if you'd rather hand it off, a project-specific proposal in 48–72 hours.

Email Varni

Opens your email app with a short draft. Add a line and attach PDFs.

Questions we hear

What should I do if a quote arrives after the deadline for review?

Compare it to your plug quickly on scope and exclusions. If it is clearly comparable and lower, use it; if not, keep the plug. Never swap in a quote you have not checked for exclusions.

How do I handle a missing quote?

Carry a reasonable plug based on past pricing or a budget number, mark it clearly, and decide whether to qualify that scope in your proposal.

Should the proposal list the addenda?

Yes. Listing addenda by number and date shows exactly which documents your price is based on.

Work with Varni

Bring Varni onto your next project.

Send the drawings, the deadline and where you need help. We reply with a clear scope, a project-specific fee and a start date.

or write to ravid@varni-ventures.com No set prices · Proposal in 48–72 hours