Documents
- Every addendum acknowledged on the bid form and reflected in the takeoff.
- The bid form matches the latest version, including alternates and unit prices.
- Bid due time, delivery method and time zone confirmed.
- Required attachments listed: bid bond, forms, certifications, schedule of values.
Scope
- Every specification section in your scope has a line in the estimate.
- Items "by others" confirmed against the drawings and spec, not assumed.
- Allowances carried at exactly the amounts the documents state.
- Exclusions and clarifications written down for the proposal.
Quotes
- Supplier and subcontractor quotes leveled scope for scope.
- Quote exclusions checked against what you are including.
- Freight, taxes, escalation and quote validity accounted for.
- Plugs for missing quotes marked clearly so you can update them at the last minute.
Labor and markup
- Labor hours sanity-checked against similar past jobs.
- Wage rates current, including any prevailing wage requirements.
- General conditions priced for the actual schedule duration.
- Overhead, profit, bond and insurance applied the way you intend.
Final review
- Big-number check: cost per square foot or unit compared with similar work.
- The five largest line items reviewed by a second person.
- The proposal letter matches the estimate's scope, exclusions and alternates.
- A copy of everything submitted saved with the bid log.
| Time before deadline | Focus |
|---|---|
| Day before | Addenda, scope review, plugs identified |
| Morning | Quotes in and leveled, labor reviewed |
| Two hours | Markup, big-number check, proposal drafted |
| Final hour | Late quotes plugged, bid form completed, submitted |
Varni supports bid days with estimating, quote leveling and proposal writing.
We do this all day
Stuck on this? Email us.
Send us what you have and where you're stuck. Our PMP® and LEED AP BD+C credentialed staff will reply with next steps, and if you'd rather hand it off, a project-specific proposal in 48–72 hours.
Opens your email app with a short draft. Add a line and attach PDFs.
Questions we hear
What should I do if a quote arrives after the deadline for review?
Compare it to your plug quickly on scope and exclusions. If it is clearly comparable and lower, use it; if not, keep the plug. Never swap in a quote you have not checked for exclusions.
How do I handle a missing quote?
Carry a reasonable plug based on past pricing or a budget number, mark it clearly, and decide whether to qualify that scope in your proposal.
Should the proposal list the addenda?
Yes. Listing addenda by number and date shows exactly which documents your price is based on.