The five bottlenecks
| Bottleneck | Why it happens | Fix |
|---|---|---|
| Late register | Nobody lists required submittals at the start | Build the register from the specs in week one |
| Incomplete packages | Missing data sheets, options not marked | A package checklist per spec section |
| Unclear compliance | Reviewer can't see how the product meets the spec | Mark spec requirements on the data sheets; note deviations |
| Slow reviews | No dates, no follow-up | Needed-by dates tied to lead times; weekly chasing |
| Resubmittal loops | Comments answered partially | Respond to every comment in a cover letter |
Work backward from the install date
For each item: install date, minus delivery and fabrication lead time, minus review time, minus preparation time. That's when the submittal needs to go out. Long-lead equipment goes first.
Make the reviewer's job easy
- One spec section per package.
- Exact product, model and options marked.
- Deviations listed up front, not hidden.
- A clean cover sheet with the spec reference.
See our product data checklist, the free submittal log, or hand it off: submittal management.
We do this all day
Stuck on this? Email us.
Send us what you have and where you're stuck. Our PMP® and LEED AP BD+C credentialed staff will reply with next steps, and if you'd rather hand it off, a project-specific proposal in 48–72 hours.
Opens your email app with a short draft. Add a line and attach PDFs.
Questions we hear
Who should prepare submittals?
Usually the installing subcontractor, reviewed by the GC before going to the design team. Many teams outsource preparation to save PM time.
How long does submittal review take?
Your contract or Division 01 often sets a review period. Plan around it and track every submittal against it.
What if a submittal keeps getting rejected?
Read the comments line by line, ask a clarifying question if needed, and answer each comment in writing with the resubmittal.