Combine every walk-through into a single numbered list with location, description, photo, responsible trade and due date. Duplicates and vague items ("touch up paint") cause the most back-and-forth; be specific.
Split it by trade
Send each subcontractor only their items, as their own list. People finish lists they can see the end of.
Track it weekly
| Status | Meaning |
|---|---|
| Open | Not started |
| In progress | Trade working on it |
| Ready for review | Trade says done; photo attached |
| Closed | Verified and accepted |
| Back-charge | Done by others at the responsible trade's cost |
Verify before re-inspection
Have your field team confirm items with photos before asking the architect or owner to re-inspect. Failed re-inspections cost the most time.
Tie it to closeout
Punch completion, the closeout binder and final waivers together release retainage. Work all three in parallel, not one after another.
Want someone to own the list? See punch list coordination.
We do this all day
Stuck on this? Email us.
Send us what you have and where you're stuck. Our PMP® and LEED AP BD+C credentialed staff will reply with next steps, and if you'd rather hand it off, a project-specific proposal in 48–72 hours.
Opens your email app with a short draft. Add a line and attach PDFs.
Questions we hear
Who creates the punch list?
Typically the architect or owner's representative walks the project, often with the GC, and the GC distributes items to trades.
How long should a punch list take?
It depends on the project, but a coordinated list with weekly follow-up closes much faster than one left to each trade.
What about items nobody will take?
Assign them in writing based on the scope documents, and use back-charges when a responsible trade doesn't respond.