A project folder structure
| Folder | Contents |
|---|---|
| 01 Contract | Contract, subcontracts, insurance, bonds, notices |
| 02 Drawings and specs | Current set, superseded sets, bulletins, addenda |
| 03 Submittals | Register, packages by spec section, responses |
| 04 RFIs | Log, issued RFIs, answers |
| 05 Changes | Change order log, requests, executed changes, T&M tickets |
| 06 Billing | Schedule of values, pay applications, lien waivers |
| 07 Schedule | Baseline, updates, look-aheads |
| 08 Meetings | Agendas, minutes, sign-in sheets |
| 09 Field | Daily reports, photos, inspections, safety |
| 10 Procurement | Quotes, purchase orders, delivery tracking |
| 11 Correspondence | Letters and important email, saved as files |
| 12 Closeout | O&M, warranties, as-builts, attic stock, training |
A file naming convention
Pick one pattern and never deviate. A good pattern sorts by date and is readable at a glance:
YYYY-MM-DD_Type-Number_Short-description_Rev
Example: 2026-10-14_RFI-012_Duct-conflict-C4_R0.pdf
- Dates in year-month-day order so files sort correctly.
- No spaces or special characters; use hyphens and underscores.
- Revision numbers on everything that can be revised.
Drawing and specification control
- Keep only the current set in the current folder.
- Move superseded sheets to a superseded folder, stamped or renamed as superseded.
- Log every bulletin, revision and addendum with the sheets it affects.
- Tell the field when sheets change, and confirm they replaced their copies.
The logs that matter
Submittals, RFIs, change orders, procurement, transmittals and lien waivers each need a log with a consistent number, date, status and ball-in-court. Review them weekly. Our free submittal log is a good starting point.
Habits that keep it working
- File as you go: same day, not at month-end.
- Save important emails as files in the right folder.
- Collect closeout items, such as warranties and O&M data, as soon as products are approved.
- Audit the folders monthly for stray and duplicate files.
We do this all day
Stuck on this? Email us.
Send us what you have and where you're stuck. Our PMP® and LEED AP BD+C credentialed staff will reply with next steps, and if you'd rather hand it off, a project-specific proposal in 48–72 hours.
Opens your email app with a short draft. Add a line and attach PDFs.
Questions we hear
Should we use a project management platform or a shared drive?
Either works if the structure and naming are consistent. Many contractors use the platform the owner or GC requires for some items and a shared drive for everything else.
How do we handle email?
Save decisions, directives, notices and approvals as PDF files in the matching folder, named with the convention, so they are findable without searching inboxes.
Who owns document control on a project?
Usually the project engineer or project coordinator, with the project manager reviewing. On smaller teams, it can be outsourced.